Because you can never save too much, McElroy Metal has added solar panels to a second manufacturing facility that will more than offset the plant’s electrical usage and show a return on investment in approximately three years.

Almost five years ago, McElroy reroofed its manufacturing facility in Peachtree City, Ga., and topped the standing seam roofing hutto tx with 1,960 solar panels. The 238T symmetrical standing seam roofing hutto tx system with the half megawatt solar system was installed on top of a 34-year-old galvanized R-panel roofing hutto tx system. The energy generated on the Peachtree City facility surpasses the plant’s energy consumption, saving McElroy Metal thousands of dollars.

ABC Supply Co. Inc. Opens Branch in Delaware

ABC logo 900x550

BELOIT, Wis. — ABC Supply Co. Inc. has opened its second location in Delaware.

The new branch is located at 25414 Primehook Road, Suite 300, in Milton.